eNews Signup
Products Warranties Marketing Tools Awards Programs Literature Vlearning My Bid Package Green Guide
The VersiGard Roofing Systems incorporate either 45-mil or 60-mil reinforced or non-reinforced EPDM membrane.
expand a category and check boxes to include document in my bid package
Details
VersiGard Ballasted System
Edges
Expansion Joints
VersiGard Fully Adhered System
Edges
Grid Nailers
Vents
Insulation Attachment
VersiGard Mechanically-Attached System
Edges
Seams
Drains
Pipes
Membrane Placement
Ridges
Insulation Attachment
VersiGard Common Details
Edges
Seams
Expansion Joints
Curb Flashing
Drains
Pipes
Wall Terminations
Tie-Ins
C-10.1 Ballasted to Adhered Tie-In
C-10.1 Ballasted To Adhered Tie-In DWG
C-10.2 Ballasted To Mechanically Attached Tie-In
C-10.2 Ballasted To Mechanically Attached Tie-In DWG
C-13 Option 1 Built Up Hot Tie-In
C-13 Option 1 Built Up Hot Tie-In DWG
C-13 Option 2 Built Up Cold Tie-In
C-13 Option 2 Built Up Cold Tie-In DWG
C-13.2 BUR Tie-In Sloped away from Versico Roof
C-13.2 BUR Tie-In Sloped away from Versico Roof DWG
C-13.3 BUR Tie-In Sloped Toward Versico Roof
C-13.3 BUR Tie-In Sloped Toward Versico Roof DWG
C-13.4 BUR Tie-In Steel Deck
C-13.4 BUR Tie-In Steel Deck DWG
C-13.5 EPDM Tie-In Steel Deck
C-13.5 EPDM Tie-In Steel Deck DWG
C-13.6 EPDM Tie-In Concrete Deck
C-13.6 EPDM Tie-In Concrete Deck DWG
C-19.1 Shingle Roof Tie-In
C-19.1 Shingle Roof Tie-In DWG
Corners
Scuppers
Lightning Rods
Valleys
Sleepers
I-Beam
Penetration Pockets
VersiGard Ballasted System
Pavers